Construction experiences of cement stabilized soil material base-course and subbase in Laixi Interchange Project
Yue Ding
Abstract
Yue Ding
Abstract
Taking Laixi Interchange Project as example the technical measures in the construction of subbase with cement stabilized weathered rock granular material and base course with cement stabilized crushed materials are introduced. Meanwhile, some valuable experiences are summarized as well as the matters needing attention in the future.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking Laixi Interchange Project as example the technical measures in the construction of subbase with cement stabilized weathered rock granular material and base course with cement stabilized crushed materials are introduced. Meanwhile, some valuable experiences are summarized as well as the matters needing attention in the future.
Key concepts: Subbase, Cement, Base course, Soil cement, Course (navigation), Geotechnical engineering, Base (topology), Crushed stone