Optimized Program of Specialized Course Ore Wharf Structure in Tianjin Port

Zhu Zi-ping

Open publisher page 0 citations

Abstract

With the design of over 200 000 huge tonners,the wharf position of Tianjin Harbor will definitely be developed to eastern open areas,and therefore,the wave height of wharf apron has to be increased. During the construction of professional bulk cargo wharf,traditional high piled beam-slab structure progressively reflects the characters of great deformation and high cost. Based on the specific engineering projects,this paper puts forward a new program for decorating abutment structure and girder pier structure by alternate. The optimized program has characters of reasonable structure,low cost,convenient construction

About this research paper

What this paper is about

With the design of over 200 000 huge tonners,the wharf position of Tianjin Harbor will definitely be developed to eastern open areas,and therefore,the wave height of wharf apron has to be increased. During the construction of professional bulk cargo wharf,traditional high piled beam-slab structure progressively reflects the characters of great deformation and high cost. Based on the specific engineering projects,this paper puts forward a new program for decorating abutment structure and girder pier structure by alternate. The optimized program has characters of reasonable structure,low cost,convenient construction

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

With the design of over 200 000 huge tonners,the wharf position of Tianjin Harbor will definitely be developed to eastern open areas,and therefore,the wave height of wharf apron has to be increased. During the construction of professional bulk cargo wharf,traditional high piled beam-slab structure progressively reflects the characters of great deformation and high cost. Based on the specific engineering projects,this paper puts forward a new program for decorating abutment structure and girder pier structure by alternate. The optimized program has characters of reasonable structure,low cost,convenient construction

Key concepts: Wharf, Pier, Port (circuit theory), Engineering, Slab, Girder, Course (navigation), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimized Program of Specialized Course Ore Wharf Structure in Tianjin Port — Research Paper | ScholarLens