2003BlastingRequires access

Blasting Demolition Project of a Brick-concrete Office Building

Jian Li

Open publisher page 0 citations

Abstract

The demolition method, selection of blasting parameters, blasting network, and defending measure of the controlled blasting are discussed. The reliability of control collapse direction is dependent on the blasting height and blasting sequence.

About this research paper

What this paper is about

The demolition method, selection of blasting parameters, blasting network, and defending measure of the controlled blasting are discussed. The reliability of control collapse direction is dependent on the blasting height and blasting sequence.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The demolition method, selection of blasting parameters, blasting network, and defending measure of the controlled blasting are discussed. The reliability of control collapse direction is dependent on the blasting height and blasting sequence.

Key concepts: Demolition, Rock blasting, Brick, Engineering, Drilling and blasting, Forensic engineering, Civil engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Blasting Demolition Project of a Brick-concrete Office Building — Research Paper | ScholarLens