2015•Port & Waterway EngineeringRequires access

Effect of large-scale hydraulic projects on river regime evolution in north channel of Yangtze estuary

MO Ruo-y

Open publisher page 0 citations

Abstract

As a secondary inlet of the Yangtze estuary, the north channel experienced several large-scale hydraulic projects in recent decades,such as sand stabilization project in the separating pass of the south and north channels,Qingcaosha reservoir project and siltation promotion project in the Hengsha east shoal,etc.,which made the river regime more stable to some extent. Meanwhile,many new unexpected situations occurred following them,especially under the background of drastic decline in river sediment supply. The stability of sand bodies over the south side of Xingqiao channel was enhanced during the sand stabilization project in the separating pass of the south and north channels. However,the spilt ratio of the north channel decreased owing to the northward movement of the Biandansha shoal in this period. After the project of Qingcaosha reservoir,the upper part of the north channel kept scouring,with the development of Hengsha passage,the channel's curvature increased. Due to the siltation promotion project in the Hengsha east shoal as well as the natural deposition in the north channel mouth bar area,the northinlet of the north channel developed. However, the water-intaking program of avoiding saltwater and storing freshwater was seriously influenced by the strong flood current in this inlet.

About this research paper

What this paper is about

As a secondary inlet of the Yangtze estuary, the north channel experienced several large-scale hydraulic projects in recent decades,such as sand stabilization project in the separating pass of the south and north channels,Qingcaosha reservoir project and siltation promotion project in the Hengsha east shoal,etc.,which made the river regime more stable to some extent. Meanwhile,many new unexpected situations occurred following them,especially under the background of drastic decline in river sediment supply. The stability of sand bodies over the south side of Xingqiao channel was enhanced during the sand stabilization project in the separating pass of the south and north channels. However,the spilt ratio of the north channel decreased owing to the northward movement of the Biandansha shoal in this period. After the project of Qingcaosha reservoir,the upper part of the north channel kept scouring,with the development of Hengsha passage,the channel's curvature increased. Due to the siltation promotion project in the Hengsha east shoal as well as the natural deposition in the north channel mouth bar area,the northinlet of the north channel developed. However, the water-intaking program of avoiding saltwater and storing freshwater was seriously influenced by the strong flood current in this inlet.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

As a secondary inlet of the Yangtze estuary, the north channel experienced several large-scale hydraulic projects in recent decades,such as sand stabilization project in the separating pass of the south and north channels,Qingcaosha reservoir project and siltation promotion project in the Hengsha east shoal,etc.,which made the river regime more stable to some extent. Meanwhile,many new unexpected situations occurred following them,especially under the background of drastic decline in river sediment supply. The stability of sand bodies over the south side of Xingqiao channel was enhanced during the sand stabilization project in the separating pass of the south and north channels. However,the spilt ratio of the north channel decreased owing to the northward movement of the Biandansha shoal in this period. After the project of Qingcaosha reservoir,the upper part of the north channel kept scouring,with the development of Hengsha passage,the channel's curvature increased. Due to the siltation promotion project in the Hengsha east shoal as well as the natural deposition in the north channel mouth bar area,the northinlet of the north channel developed. However, the water-intaking program of avoiding saltwater and storing freshwater was seriously influenced by the strong flood current in this inlet.

Key concepts: Shoal, Siltation, Channel (broadcasting), Estuary, Hydrology (agriculture), Inlet, River regime, Deposition (geology)

Related papers

Back to paper searchBrowse research topicsOriginal source
Effect of large-scale hydraulic projects on river regime evolution in north channel of Yangtze estuary — Research Paper | ScholarLens