2007•Journal of Jilin UniversityRequires access

The Main Three Problems and Solutions for Qinghai-Tibet Railway Construction

Ning Li

Open publisher page 1 citations

Abstract

Qinghai-Tibet railway,the first highland railway crossing permafrost region in the world,was confronted with main three mainly difficult problems,permafrost,high-cold and oxygen deficit,and ecologic frangibility.Its construction was more complicated and difficult than the other permafrost engineering at China and abroad.Due to the nature and complexity during Qinghai-Tibet railway construction,many effective measures were adopted in design and construction including various measures for permafrost protection,measures for labor health and labor protection on plateau,measures for ecological environment protection and preventing pollution,etc.These various measures showed approved effects during railway construction and operation.

About this research paper

What this paper is about

Qinghai-Tibet railway,the first highland railway crossing permafrost region in the world,was confronted with main three mainly difficult problems,permafrost,high-cold and oxygen deficit,and ecologic frangibility.Its construction was more complicated and difficult than the other permafrost engineering at China and abroad.Due to the nature and complexity during Qinghai-Tibet railway construction,many effective measures were adopted in design and construction including various measures for permafrost protection,measures for labor health and labor protection on plateau,measures for ecological environment protection and preventing pollution,etc.These various measures showed approved effects during railway construction and operation.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Qinghai-Tibet railway,the first highland railway crossing permafrost region in the world,was confronted with main three mainly difficult problems,permafrost,high-cold and oxygen deficit,and ecologic frangibility.Its construction was more complicated and difficult than the other permafrost engineering at China and abroad.Due to the nature and complexity during Qinghai-Tibet railway construction,many effective measures were adopted in design and construction including various measures for permafrost protection,measures for labor health and labor protection on plateau,measures for ecological environment protection and preventing pollution,etc.These various measures showed approved effects during railway construction and operation.

Key concepts: Permafrost, Plateau (mathematics), China, Civil engineering, Environmental science, Transport engineering, Environmental protection, Environmental planning

Related papers

Back to paper searchBrowse research topicsOriginal source
The Main Three Problems and Solutions for Qinghai-Tibet Railway Construction — Research Paper | ScholarLens