Hydro-jetting and Staged-fracturing Technique with Original Production String Applied in Deep Gas Reservoir
Huang Yu-zhong
Abstract
Huang Yu-zhong
Abstract
As a low-porosity,low-permeability,and tight sandstone gas reservoir,Xujiahe 4 Member of western Sichuan Basin is featured by deep burial depth,high pressure,and high fracturing and extension pressure.So it is difficult to carry out a fracturing.During the completion of liner tube in horizontal section of X21-2H well,combining with hydraulic-jetting and sliding-sleeve multi-layer fracturing,this study develops another hydraulic-jetting and staged-fracturing of original production string.Multi-staged fracturing has been realized by sand blasting perforation and fracturing after opening sliding-sleeve.By optimizing the nozzle number,in-well string and the injection volume of tools and tubing-casing,adopting over-crosslinking fracturing fluid and annular pressure control,this fracturing ensures a smooth construction and succeeds in deep and tight gas reservoir with high pressure.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As a low-porosity,low-permeability,and tight sandstone gas reservoir,Xujiahe 4 Member of western Sichuan Basin is featured by deep burial depth,high pressure,and high fracturing and extension pressure.So it is difficult to carry out a fracturing.During the completion of liner tube in horizontal section of X21-2H well,combining with hydraulic-jetting and sliding-sleeve multi-layer fracturing,this study develops another hydraulic-jetting and staged-fracturing of original production string.Multi-staged fracturing has been realized by sand blasting perforation and fracturing after opening sliding-sleeve.By optimizing the nozzle number,in-well string and the injection volume of tools and tubing-casing,adopting over-crosslinking fracturing fluid and annular pressure control,this fracturing ensures a smooth construction and succeeds in deep and tight gas reservoir with high pressure.
Key concepts: Hydraulic fracturing, Tight gas, Petroleum engineering, Geology, Casing, Completion (oil and gas wells), Nozzle, Perforation