The treatment construction points on the East West highway special subgrade in Algeria
LI Ying-ju
Abstract
LI Ying-ju
Abstract
Combined with the PK128+890~PK129+000 reinforced subgrade filling construction of the East West highway in Algeria.It has a detailed exposition on the construction process and the major controlling procedure on the special subgrade construction.Introduced the methods of knowing from the ordinary subgrade filling to guide the subgrade construction under the similar condition.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with the PK128+890~PK129+000 reinforced subgrade filling construction of the East West highway in Algeria.It has a detailed exposition on the construction process and the major controlling procedure on the special subgrade construction.Introduced the methods of knowing from the ordinary subgrade filling to guide the subgrade construction under the similar condition.
Key concepts: Subgrade, Road construction, Geotechnical engineering, Civil engineering, Engineering, Forensic engineering, Geology