Design of High Side Slope Drainage System at the Intake of Longtan Hydropower Station
Zhou Hai
Abstract
Zhou Hai
Abstract
As the maximum height of side slope at the intake of the underground powerhouse of Longtan hydropower station is as much as 420 m,a long term of design studies are made in order to solve the problem of slope stability.Based on the large amount of study results and design experiences,a rational excavation form and reinforcing measures are defined,and a three dimensional drainage network,which is composed of ground drainage system and underground drainage system,is set up.Ground drainage system is made up of crisscross catchwater and the underground system is made up of 8 layers of clued leading drainage tunnels together with embranchment,as well as drainage holes inside the tunnels.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
As the maximum height of side slope at the intake of the underground powerhouse of Longtan hydropower station is as much as 420 m,a long term of design studies are made in order to solve the problem of slope stability.Based on the large amount of study results and design experiences,a rational excavation form and reinforcing measures are defined,and a three dimensional drainage network,which is composed of ground drainage system and underground drainage system,is set up.Ground drainage system is made up of crisscross catchwater and the underground system is made up of 8 layers of clued leading drainage tunnels together with embranchment,as well as drainage holes inside the tunnels.