Technical Improvement of the Wire between 40.5 kV Circuit Breaker and Disconnector in Zhuozhou 220 kV Substation
Yumin Ge
Abstract
Yumin Ge
Abstract
This paper discusses the disadvantages of moving contact loosing, escaping from the closing position because of the hard bus connection between the circuit breaker and the disconnector. The improvement of reforming the hard bus connection to a soft one between 40.5 kV circuit breaker and disconnector is made in Zhuozhou 220 kV substation. The author also gives the method to solve this kind of problem.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper discusses the disadvantages of moving contact loosing, escaping from the closing position because of the hard bus connection between the circuit breaker and the disconnector. The improvement of reforming the hard bus connection to a soft one between 40.5 kV circuit breaker and disconnector is made in Zhuozhou 220 kV substation. The author also gives the method to solve this kind of problem.
Key concepts: Disconnector, Circuit breaker, Electrical engineering, Engineering, Closing (real estate), Arc-fault circuit interrupter, Connection (principal bundle), Short circuit