On construction method of steel sheet pile cofferdam on deep water pile
Liu Dong-y
Abstract
Liu Dong-y
Abstract
This paper describes that steel sheet pile cofferdam program is adopted in deep water pile of Shiwan Bridge on Chanxi road in Foshan city.Through illustrating the plan selection,structural design and construction elements,it proves that this program is a reasonable construction method and technical measure.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper describes that steel sheet pile cofferdam program is adopted in deep water pile of Shiwan Bridge on Chanxi road in Foshan city.Through illustrating the plan selection,structural design and construction elements,it proves that this program is a reasonable construction method and technical measure.
Key concepts: Cofferdam, Sheet pile, Pile, Engineering, Bridge (graph theory), Deep water, Geotechnical engineering, Plan (archaeology)