Construction summarization on the subway next to bridge pile foundation
Yang Rong-shen
Abstract
Yang Rong-shen
Abstract
It expounds the surrounding rock reinforcement,monitoring and measurement,and impacts of subway construction on existing bridge while the subway interval sections passes through existing urban road bridge pile foundation,which has provide valuable experience for the design and construction of subway next to bridge pile foundation.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
It expounds the surrounding rock reinforcement,monitoring and measurement,and impacts of subway construction on existing bridge while the subway interval sections passes through existing urban road bridge pile foundation,which has provide valuable experience for the design and construction of subway next to bridge pile foundation.
Key concepts: Pile, Bridge (graph theory), Foundation (evidence), Automatic summarization, Engineering, Civil engineering, Forensic engineering, Construction engineering