2013•Meitan xuebaoOpen access

Method of division and engineering use of “three band”in the stope again

Wang Zhi-qian

Open full text 16 citations

Abstract

This paper does a research on covering the shortage of method for determining the water flowing fractured zone,it investigated the method ofthree-zonepartition for overburden strata. The author used the methods including the similar simulations,theoretical analysis and field verification. At the initial stage,the theoretical analysis and analogue simulation found that caving height,caving space,coefficient of residual bulk,distance between key rock strata and coal seam,and the features of key rock strata affect the distribution of three-zonepartition for overburden strata. Based on the initial stage results,a new method for three-zonepartition and its application conditions were proposed. Finally,a case study at the coal working face 7130,6130,and 7121 in Qidong Coal Mine,and the working face41301 in Bulianta Coal Mine and the working face 6206 in Lu'an Coal Mine were conducted to verify the proposed method. Results show that the proposed method is more objective than existing methods.

About this research paper

What this paper is about

This paper does a research on covering the shortage of method for determining the water flowing fractured zone,it investigated the method ofthree-zonepartition for overburden strata. The author used the methods including the similar simulations,theoretical analysis and field verification. At the initial stage,the theoretical analysis and analogue simulation found that caving height,caving space,coefficient of residual bulk,distance between key rock strata and coal seam,and the features of key rock strata affect the distribution of three-zonepartition for overburden strata. Based on the initial stage results,a new method for three-zonepartition and its application conditions were proposed. Finally,a case study at the coal working face 7130,6130,and 7121 in Qidong Coal Mine,and the working face41301 in Bulianta Coal Mine and the working face 6206 in Lu'an Coal Mine were conducted to verify the proposed method. Results show that the proposed method is more objective than existing methods.

Why it matters

OpenAlex reports 16 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper does a research on covering the shortage of method for determining the water flowing fractured zone,it investigated the method ofthree-zonepartition for overburden strata. The author used the methods including the similar simulations,theoretical analysis and field verification. At the initial stage,the theoretical analysis and analogue simulation found that caving height,caving space,coefficient of residual bulk,distance between key rock strata and coal seam,and the features of key rock strata affect the distribution of three-zonepartition for overburden strata. Based on the initial stage results,a new method for three-zonepartition and its application conditions were proposed. Finally,a case study at the coal working face 7130,6130,and 7121 in Qidong Coal Mine,and the working face41301 in Bulianta Coal Mine and the working face 6206 in Lu'an Coal Mine were conducted to verify the proposed method. Results show that the proposed method is more objective than existing methods.

Key concepts: Overburden, Mining engineering, Coal, Coal mining, Geology, Stage (stratigraphy), Division (mathematics), Economic shortage

Related papers

Back to paper searchBrowse research topicsOriginal source
Method of division and engineering use of “three band”in the stope again — Research Paper | ScholarLens