2012Fujian Architecture & ConstructionRequires access

Design method and engineering example of piled raft foundation with settlement adjustor

Feng Zhou

Open publisher page 0 citations

Abstract

Using settlement adjustor,piled raft foundation with settlement adjustor realized adjustment and optimization of supporting stiffness of pile-soil.Piled raft foundation with settlement adjustor could be applied to all these fields,pile-soil interaction of endbearing pile foundation,optimized design of pile foundation stiffness to reduce differential settlement,regeneration of old pile foundation,and soil-rock composite subgrade.As new form of piled raft foundation,piled raft foundation with settlement adjustor had achieved significant economic benefits and social benefits.In order to promote the apply and development of piled raft foundation with settlement adjustor and form serial design theory and method,this paper introduced detailedly design process of piled raft foundation with settlement adjustor,and analysed its design method through engineering example.All content above couled be available for reference to technician and relative person.

About this research paper

What this paper is about

Using settlement adjustor,piled raft foundation with settlement adjustor realized adjustment and optimization of supporting stiffness of pile-soil.Piled raft foundation with settlement adjustor could be applied to all these fields,pile-soil interaction of endbearing pile foundation,optimized design of pile foundation stiffness to reduce differential settlement,regeneration of old pile foundation,and soil-rock composite subgrade.As new form of piled raft foundation,piled raft foundation with settlement adjustor had achieved significant economic benefits and social benefits.In order to promote the apply and development of piled raft foundation with settlement adjustor and form serial design theory and method,this paper introduced detailedly design process of piled raft foundation with settlement adjustor,and analysed its design method through engineering example.All content above couled be available for reference to technician and relative person.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Using settlement adjustor,piled raft foundation with settlement adjustor realized adjustment and optimization of supporting stiffness of pile-soil.Piled raft foundation with settlement adjustor could be applied to all these fields,pile-soil interaction of endbearing pile foundation,optimized design of pile foundation stiffness to reduce differential settlement,regeneration of old pile foundation,and soil-rock composite subgrade.As new form of piled raft foundation,piled raft foundation with settlement adjustor had achieved significant economic benefits and social benefits.In order to promote the apply and development of piled raft foundation with settlement adjustor and form serial design theory and method,this paper introduced detailedly design process of piled raft foundation with settlement adjustor,and analysed its design method through engineering example.All content above couled be available for reference to technician and relative person.

Key concepts: Pile, Settlement (finance), Foundation (evidence), Engineering, Geotechnical engineering, Raft, Stiffness, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Design method and engineering example of piled raft foundation with settlement adjustor — Research Paper | ScholarLens