Study on Changheba Hydropower Station Flood Discharging Works Layout

Jin Li

Open publisher page 0 citations

Abstract

Water-retaining works of Changheba Hydropower maximum probable flood reaches 10,000 m3/s with great flood discharge power.It is not possible to discharge flood through the dam body.According to common practice,for a core wall type rockfill dam,bank side spillway or spillway tunnel shall be arranged for flood releasing.Based on Changheba dam site topographic and geologic conditions,the schemes of whole spillway tunnel and spillway tunnel in combination with open spillway have been compared technically and economically for a long time.The whole spillway tunnel scheme is finally sugested.

About this research paper

What this paper is about

Water-retaining works of Changheba Hydropower maximum probable flood reaches 10,000 m3/s with great flood discharge power.It is not possible to discharge flood through the dam body.According to common practice,for a core wall type rockfill dam,bank side spillway or spillway tunnel shall be arranged for flood releasing.Based on Changheba dam site topographic and geologic conditions,the schemes of whole spillway tunnel and spillway tunnel in combination with open spillway have been compared technically and economically for a long time.The whole spillway tunnel scheme is finally sugested.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Water-retaining works of Changheba Hydropower maximum probable flood reaches 10,000 m3/s with great flood discharge power.It is not possible to discharge flood through the dam body.According to common practice,for a core wall type rockfill dam,bank side spillway or spillway tunnel shall be arranged for flood releasing.Based on Changheba dam site topographic and geologic conditions,the schemes of whole spillway tunnel and spillway tunnel in combination with open spillway have been compared technically and economically for a long time.The whole spillway tunnel scheme is finally sugested.

Key concepts: Spillway, Hydropower, Flood myth, Geotechnical engineering, Engineering, Civil engineering, Geology, Geography

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Changheba Hydropower Station Flood Discharging Works Layout — Research Paper | ScholarLens