2001•Journal of Sediment ResearchRequires access

Operation of Sanmenxia Reservoir on the Control of Flood and Ice Run after Xiaolangdi Project Operated

Hu Yi

Open publisher page 0 citations

Abstract

Joint operation of Xiaolangdi with Sanmenxia,Luhun and Guxian Reservoir,together with other works for flood prevention,will be instrumental to raising effectively the present standard of defending flood on the lower Yellow River, alleviating burden of Sanmenxia Reservoir in flood and ice run control and reducing deposition in the reservoir .When flood occurring mainly in the upstream of Sanmenxia,Xiaolangdi and Sanmenxia Reservoir will put into joint operation. There are three flood control methods for Sanmenxia Reservoir. These are respectively : (1) All outlets are opened free during flood peaks; (2) The reservoir is not adequate control until maximal storage level reaches; (3) The reservoir is not adequate control until certain storage level of Xiaolangdi Reservoir occurs .The research results show that the third flood control method is the best.

About this research paper

What this paper is about

Joint operation of Xiaolangdi with Sanmenxia,Luhun and Guxian Reservoir,together with other works for flood prevention,will be instrumental to raising effectively the present standard of defending flood on the lower Yellow River, alleviating burden of Sanmenxia Reservoir in flood and ice run control and reducing deposition in the reservoir .When flood occurring mainly in the upstream of Sanmenxia,Xiaolangdi and Sanmenxia Reservoir will put into joint operation. There are three flood control methods for Sanmenxia Reservoir. These are respectively : (1) All outlets are opened free during flood peaks; (2) The reservoir is not adequate control until maximal storage level reaches; (3) The reservoir is not adequate control until certain storage level of Xiaolangdi Reservoir occurs .The research results show that the third flood control method is the best.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Joint operation of Xiaolangdi with Sanmenxia,Luhun and Guxian Reservoir,together with other works for flood prevention,will be instrumental to raising effectively the present standard of defending flood on the lower Yellow River, alleviating burden of Sanmenxia Reservoir in flood and ice run control and reducing deposition in the reservoir .When flood occurring mainly in the upstream of Sanmenxia,Xiaolangdi and Sanmenxia Reservoir will put into joint operation. There are three flood control methods for Sanmenxia Reservoir. These are respectively : (1) All outlets are opened free during flood peaks; (2) The reservoir is not adequate control until maximal storage level reaches; (3) The reservoir is not adequate control until certain storage level of Xiaolangdi Reservoir occurs .The research results show that the third flood control method is the best.

Key concepts: Flood myth, Flood control, Environmental science, Hydrology (agriculture), Deposition (geology), Geology, Sediment, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Operation of Sanmenxia Reservoir on the Control of Flood and Ice Run after Xiaolangdi Project Operated — Research Paper | ScholarLens