Causes Analysis on Seepage of Newly Built Dam of Tibet Jiangxiong Reservoir and Treatment
Zhu Jia-wang
Abstract
Zhu Jia-wang
Abstract
At initial impoundment period,the water level in observation hole became high,the seepage amount was gradually increasing at the downstream of Jiangxiong reservoir dam and the abnormal phenomena appeared with maximum seepage amount of 300 L/s at the measuring weir,which affect the dam safety.Analysis was made on the major seepage causes of dam foundation,around-the-dam,spillway and water intake tunnel by dam observation system,electricity detection and interconnection test,the main seepage channels found to provide decision basis for dam impermeable scheme.And a view is also presented in this paper that safe seepage has enormous function to protect downstream ecology.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
At initial impoundment period,the water level in observation hole became high,the seepage amount was gradually increasing at the downstream of Jiangxiong reservoir dam and the abnormal phenomena appeared with maximum seepage amount of 300 L/s at the measuring weir,which affect the dam safety.Analysis was made on the major seepage causes of dam foundation,around-the-dam,spillway and water intake tunnel by dam observation system,electricity detection and interconnection test,the main seepage channels found to provide decision basis for dam impermeable scheme.And a view is also presented in this paper that safe seepage has enormous function to protect downstream ecology.
Key concepts: Spillway, Embankment dam, Foundation (evidence), Geotechnical engineering, Dam break, Dam removal, Geology, Hydrology (agriculture)