2010Technology of Highway and TransportRequires access

Influences of Construction Sequence of Simple-supported Beam to Continuous Beam Bridges on Internal Force of Structure

Xiang Zhengsong

Open publisher page 0 citations

Abstract

Tension of negative moment prestressed reinforcements twice and removal of temporary supports are key working procedures in construction of bridges with simple-supported beam to continuous beam structural system,and different construction sequences will produce different influences on internal force of structure.Based on a 4-span 50mT beam project as an example,this paper calculates and analyzes different construction procedures for tension of negative moment prestressed reinforcements twice and removal of temporary supports.The results of analysis show that both the sequences of prestressed tension of wet joints on beam ends and removal of temporary supports produce a certain influence on internal force of structure.

About this research paper

What this paper is about

Tension of negative moment prestressed reinforcements twice and removal of temporary supports are key working procedures in construction of bridges with simple-supported beam to continuous beam structural system,and different construction sequences will produce different influences on internal force of structure.Based on a 4-span 50mT beam project as an example,this paper calculates and analyzes different construction procedures for tension of negative moment prestressed reinforcements twice and removal of temporary supports.The results of analysis show that both the sequences of prestressed tension of wet joints on beam ends and removal of temporary supports produce a certain influence on internal force of structure.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Tension of negative moment prestressed reinforcements twice and removal of temporary supports are key working procedures in construction of bridges with simple-supported beam to continuous beam structural system,and different construction sequences will produce different influences on internal force of structure.Based on a 4-span 50mT beam project as an example,this paper calculates and analyzes different construction procedures for tension of negative moment prestressed reinforcements twice and removal of temporary supports.The results of analysis show that both the sequences of prestressed tension of wet joints on beam ends and removal of temporary supports produce a certain influence on internal force of structure.

Key concepts: Internal forces, Beam (structure), Tension (geology), Structural engineering, Moment (physics), Span (engineering), Engineering, Physics

Related papers

Back to paper searchBrowse research topicsOriginal source
Influences of Construction Sequence of Simple-supported Beam to Continuous Beam Bridges on Internal Force of Structure — Research Paper | ScholarLens