Launching and Floating of Steel Boxed Cofferdam for Main Pier Pile Cap of Bridge Part of Shanghai Changjiang River Tunnel and Bridge

Guo Zhen-wen

Open publisher page 0 citations

Abstract

This paper presents the launching and floating of steel boxed cofferdam for construction of pile cap of main pier foundation of the main navigable span of Shanghai Changjiang River Bridge in the Shanghai Changjiang River Tunnel and Bridge Project,currently the largest combined project of tunnel and bridge under construction in the world.The steel boxed cofferdam is designed as a structure combining both ship collision protection device and construction cofferdam,and is fabricated in workshop,launched to river in integrity by sliding and floated to the pier site where it will be hoisted and installed.The size of the cofferdam is 76.4 m×41.4 m×10 m,and is also the largest cofferdam for similar bridge works at present.

About this research paper

What this paper is about

This paper presents the launching and floating of steel boxed cofferdam for construction of pile cap of main pier foundation of the main navigable span of Shanghai Changjiang River Bridge in the Shanghai Changjiang River Tunnel and Bridge Project,currently the largest combined project of tunnel and bridge under construction in the world.The steel boxed cofferdam is designed as a structure combining both ship collision protection device and construction cofferdam,and is fabricated in workshop,launched to river in integrity by sliding and floated to the pier site where it will be hoisted and installed.The size of the cofferdam is 76.4 m×41.4 m×10 m,and is also the largest cofferdam for similar bridge works at present.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents the launching and floating of steel boxed cofferdam for construction of pile cap of main pier foundation of the main navigable span of Shanghai Changjiang River Bridge in the Shanghai Changjiang River Tunnel and Bridge Project,currently the largest combined project of tunnel and bridge under construction in the world.The steel boxed cofferdam is designed as a structure combining both ship collision protection device and construction cofferdam,and is fabricated in workshop,launched to river in integrity by sliding and floated to the pier site where it will be hoisted and installed.The size of the cofferdam is 76.4 m×41.4 m×10 m,and is also the largest cofferdam for similar bridge works at present.

Key concepts: Cofferdam, Pier, Pile cap, Bridge (graph theory), Engineering, Foundation (evidence), Pile, Geotechnical engineering