Study on Ventilation System Features and Ventilation Capacity Pingtu Mine

Che Hai-yun

Open publisher page 0 citations

Abstract

A relative stable period of the mine ventilation system was selected as a rated period.With the calculation on the required ventilation value of each mining and excavation face,chamber and standby working face in Pingtu Mine,the mine required ventilation value could be set up.According to the calculation of the mine ventilation capacity,the rational mining and excavation ratio of the Pingtu Mine determined was 1∶ 3 and the mine ventilation capacity was 1.20 million t/a.The mine ventilation capacity of 1.20 million t/a was verified with the mine ventilation power,the effective ventilation value at the required ventilation place,mine ventilation network capacity,diluted gas capacity and others.

About this research paper

What this paper is about

A relative stable period of the mine ventilation system was selected as a rated period.With the calculation on the required ventilation value of each mining and excavation face,chamber and standby working face in Pingtu Mine,the mine required ventilation value could be set up.According to the calculation of the mine ventilation capacity,the rational mining and excavation ratio of the Pingtu Mine determined was 1∶ 3 and the mine ventilation capacity was 1.20 million t/a.The mine ventilation capacity of 1.20 million t/a was verified with the mine ventilation power,the effective ventilation value at the required ventilation place,mine ventilation network capacity,diluted gas capacity and others.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A relative stable period of the mine ventilation system was selected as a rated period.With the calculation on the required ventilation value of each mining and excavation face,chamber and standby working face in Pingtu Mine,the mine required ventilation value could be set up.According to the calculation of the mine ventilation capacity,the rational mining and excavation ratio of the Pingtu Mine determined was 1∶ 3 and the mine ventilation capacity was 1.20 million t/a.The mine ventilation capacity of 1.20 million t/a was verified with the mine ventilation power,the effective ventilation value at the required ventilation place,mine ventilation network capacity,diluted gas capacity and others.

Key concepts: Ventilation (architecture), Mining engineering, Engineering, Environmental science, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Ventilation System Features and Ventilation Capacity Pingtu Mine — Research Paper | ScholarLens