2011Journal of Liaoning Provincial College of CommunicationsRequires access

Suizhou River Bridge Cantilever Construction of PrestressedConcrete Continuous Box Beam

Tan Ming-ji

Open publisher page 0 citations

Abstract

Main methods Bridge of prestressed concrete continuous box girder construction are the overall support casting method,subsection cantilever construction method,and place cantilever method,and so on.Variable cross-section prestressed continuous box beam construction mainly adopts two methods: suspending and combining or cantilever construction,its construction technology is complicated comparing with the Equal Section beams.According to the practice the article expounds precisely variable cross-section prestressed continuous box beam cantilever construction method,and makes a comprehensive analysis of noticeable problems in the engineering construction.

About this research paper

What this paper is about

Main methods Bridge of prestressed concrete continuous box girder construction are the overall support casting method,subsection cantilever construction method,and place cantilever method,and so on.Variable cross-section prestressed continuous box beam construction mainly adopts two methods: suspending and combining or cantilever construction,its construction technology is complicated comparing with the Equal Section beams.According to the practice the article expounds precisely variable cross-section prestressed continuous box beam cantilever construction method,and makes a comprehensive analysis of noticeable problems in the engineering construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Main methods Bridge of prestressed concrete continuous box girder construction are the overall support casting method,subsection cantilever construction method,and place cantilever method,and so on.Variable cross-section prestressed continuous box beam construction mainly adopts two methods: suspending and combining or cantilever construction,its construction technology is complicated comparing with the Equal Section beams.According to the practice the article expounds precisely variable cross-section prestressed continuous box beam cantilever construction method,and makes a comprehensive analysis of noticeable problems in the engineering construction.

Key concepts: Cantilever, Box girder, Structural engineering, Bridge (graph theory), Beam (structure), Prestressed concrete, Engineering, Section (typography)

Related papers

Back to paper searchBrowse research topicsOriginal source
Suizhou River Bridge Cantilever Construction of PrestressedConcrete Continuous Box Beam — Research Paper | ScholarLens