2013Journal of Jilin UniversityRequires access

Stability of Slope at Left Abutment of Wudongde Hydropower Station

Itasca Consulting

Open publisher page 0 citations

Abstract

Based on detailed study engineering geological conditions of slope at left abutment of Wudongde hydropower station,using a combination research means and methods of engineering geological analysis evaluation,limit equilibrium method and numerical calculation,the global and local stability of artificial slope at left abutment of Wudongde hydropower station is studied.The results show that the slope is stable as a whole from 3D distinct element simulation.The safety coefficient is 1.4-1.6 of the artificial slope is among 1.4 and 1.6 and its deformation is dominated by a small amount of rebound deformation and deformation characteristics without highlighting.Based on analyzing boundary condition of block formed after excavation,block instability mode was proposed.Starting with block stability influencing factors:geometric features,property and unloading and relaxation feature of structural plane,a block stability engineering geological evaluation standards is established and is applied in this project.A 3D rigid limit equilibrium method is used to analyze the stability of the potential failure block in abutment slope.The results show that most block was basically stable.Then some reinforcement measures are put forward for the high slopes based on global and local stability of slopes.The research results provide an important basis for design and construction.

About this research paper

What this paper is about

Based on detailed study engineering geological conditions of slope at left abutment of Wudongde hydropower station,using a combination research means and methods of engineering geological analysis evaluation,limit equilibrium method and numerical calculation,the global and local stability of artificial slope at left abutment of Wudongde hydropower station is studied.The results show that the slope is stable as a whole from 3D distinct element simulation.The safety coefficient is 1.4-1.6 of the artificial slope is among 1.4 and 1.6 and its deformation is dominated by a small amount of rebound deformation and deformation characteristics without highlighting.Based on analyzing boundary condition of block formed after excavation,block instability mode was proposed.Starting with block stability influencing factors:geometric features,property and unloading and relaxation feature of structural plane,a block stability engineering geological evaluation standards is established and is applied in this project.A 3D rigid limit equilibrium method is used to analyze the stability of the potential failure block in abutment slope.The results show that most block was basically stable.Then some reinforcement measures are put forward for the high slopes based on global and local stability of slopes.The research results provide an important basis for design and construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on detailed study engineering geological conditions of slope at left abutment of Wudongde hydropower station,using a combination research means and methods of engineering geological analysis evaluation,limit equilibrium method and numerical calculation,the global and local stability of artificial slope at left abutment of Wudongde hydropower station is studied.The results show that the slope is stable as a whole from 3D distinct element simulation.The safety coefficient is 1.4-1.6 of the artificial slope is among 1.4 and 1.6 and its deformation is dominated by a small amount of rebound deformation and deformation characteristics without highlighting.Based on analyzing boundary condition of block formed after excavation,block instability mode was proposed.Starting with block stability influencing factors:geometric features,property and unloading and relaxation feature of structural plane,a block stability engineering geological evaluation standards is established and is applied in this project.A 3D rigid limit equilibrium method is used to analyze the stability of the potential failure block in abutment slope.The results show that most block was basically stable.Then some reinforcement measures are put forward for the high slopes based on global and local stability of slopes.The research results provide an important basis for design and construction.

Key concepts: Abutment, Block (permutation group theory), Slope stability, Geotechnical engineering, Stability (learning theory), Slope stability analysis, Instability, Deformation (meteorology)