Simulation of Fault Effect on Mining Failure of Coal Seam Floor and Its Application in Water Disasters Control

Feng Qi-yan, Lai Zhou, Shengguo Jing, Yang Tian-hong

Open publisher page 1 citations

Abstract

Five water inrush events happened in Liangbei coal mine. The water source was from the confined Cambrian karst aquifer under the coal seam. According to the hydrogeological conditions of Liangbei coal mine, the numerical models, including non-fault and fault models, were established with FLAC package. Based on the theory of rock mechanics and seepage mechanics, numerical simulations were directed for revealing the failure evolution of the seam floor above the high pressure confined aquifer. Different fault factors such as fault depth and location controlling the failure of coal seam floor were discussed. Simulation results showed that failure depth for the fault model increased 20%-33% compared to the non-fault model. The fault zone, especially the area of 10 meters ahead of the fault to 15 meters behind the fault, must be paid more attention to. Accordingly, the grouting reinforced projects were designed for No. 11041, 11151, 11111 working faces in Liangbei coal mine. Targeting the failure zones of coal seam floor and fractures on top of the confined Cambrian karst aquifer, the grouting projects reinforced the water-resisting strength of the coal seam floor, which assured the safe mining in Liangbei coal mine.

About this research paper

What this paper is about

Five water inrush events happened in Liangbei coal mine. The water source was from the confined Cambrian karst aquifer under the coal seam. According to the hydrogeological conditions of Liangbei coal mine, the numerical models, including non-fault and fault models, were established with FLAC package. Based on the theory of rock mechanics and seepage mechanics, numerical simulations were directed for revealing the failure evolution of the seam floor above the high pressure confined aquifer. Different fault factors such as fault depth and location controlling the failure of coal seam floor were discussed. Simulation results showed that failure depth for the fault model increased 20%-33% compared to the non-fault model. The fault zone, especially the area of 10 meters ahead of the fault to 15 meters behind the fault, must be paid more attention to. Accordingly, the grouting reinforced projects were designed for No. 11041, 11151, 11111 working faces in Liangbei coal mine. Targeting the failure zones of coal seam floor and fractures on top of the confined Cambrian karst aquifer, the grouting projects reinforced the water-resisting strength of the coal seam floor, which assured the safe mining in Liangbei coal mine.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Five water inrush events happened in Liangbei coal mine. The water source was from the confined Cambrian karst aquifer under the coal seam. According to the hydrogeological conditions of Liangbei coal mine, the numerical models, including non-fault and fault models, were established with FLAC package. Based on the theory of rock mechanics and seepage mechanics, numerical simulations were directed for revealing the failure evolution of the seam floor above the high pressure confined aquifer. Different fault factors such as fault depth and location controlling the failure of coal seam floor were discussed. Simulation results showed that failure depth for the fault model increased 20%-33% compared to the non-fault model. The fault zone, especially the area of 10 meters ahead of the fault to 15 meters behind the fault, must be paid more attention to. Accordingly, the grouting reinforced projects were designed for No. 11041, 11151, 11111 working faces in Liangbei coal mine. Targeting the failure zones of coal seam floor and fractures on top of the confined Cambrian karst aquifer, the grouting projects reinforced the water-resisting strength of the coal seam floor, which assured the safe mining in Liangbei coal mine.

Key concepts: Coal mining, Geology, Aquifer, Hydrogeology, Coal, Fault (geology), Mining engineering, Problems in coal mining