Numerical Simulation of Pre-splitting Blasting in Steep Hard Thick Coal Seam

Nan Cun-qua

Open publisher page 0 citations

Abstract

The second1 coal seam of main mining coal seam in Xingtai coal mine is steep hard thick coal seam,because the strength of the coal and rock mass in the second1 coal seam is very high and they are large blocks,it brings a big difficulty to the coal mining of the second1 coal seam.To the actuality that the second1 coal seam is hard to mine,the dynamic analysis ANSYS /LS-DYNA was used to simulate to deep-hole pre-splitting blasting of the second1 coal seam,according to the rule that the peak of tensile stress change curve of broken bad element reach the tensile strength of coal,the pre-splitting blasting parameters are optimized.Setting the holes spacing are respectively3.0 m,3.5 m,4.0 m in the progress of simulation,then make the parameters,the appropriate loaded structure and the way of initiation.Through the numerical simulation of the three kinds of schemes,finally the optimal blasting parameters when the hole spacing is 3.5 m.

About this research paper

What this paper is about

The second1 coal seam of main mining coal seam in Xingtai coal mine is steep hard thick coal seam,because the strength of the coal and rock mass in the second1 coal seam is very high and they are large blocks,it brings a big difficulty to the coal mining of the second1 coal seam.To the actuality that the second1 coal seam is hard to mine,the dynamic analysis ANSYS /LS-DYNA was used to simulate to deep-hole pre-splitting blasting of the second1 coal seam,according to the rule that the peak of tensile stress change curve of broken bad element reach the tensile strength of coal,the pre-splitting blasting parameters are optimized.Setting the holes spacing are respectively3.0 m,3.5 m,4.0 m in the progress of simulation,then make the parameters,the appropriate loaded structure and the way of initiation.Through the numerical simulation of the three kinds of schemes,finally the optimal blasting parameters when the hole spacing is 3.5 m.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The second1 coal seam of main mining coal seam in Xingtai coal mine is steep hard thick coal seam,because the strength of the coal and rock mass in the second1 coal seam is very high and they are large blocks,it brings a big difficulty to the coal mining of the second1 coal seam.To the actuality that the second1 coal seam is hard to mine,the dynamic analysis ANSYS /LS-DYNA was used to simulate to deep-hole pre-splitting blasting of the second1 coal seam,according to the rule that the peak of tensile stress change curve of broken bad element reach the tensile strength of coal,the pre-splitting blasting parameters are optimized.Setting the holes spacing are respectively3.0 m,3.5 m,4.0 m in the progress of simulation,then make the parameters,the appropriate loaded structure and the way of initiation.Through the numerical simulation of the three kinds of schemes,finally the optimal blasting parameters when the hole spacing is 3.5 m.

Key concepts: Coal mining, Coal, Rock blasting, Mining engineering, Rock mass classification, Computer simulation, Problems in coal mining, Ultimate tensile strength

Related papers

Back to paper searchBrowse research topicsOriginal source
Numerical Simulation of Pre-splitting Blasting in Steep Hard Thick Coal Seam — Research Paper | ScholarLens