The Application of Well Dewatering in Main Building Foundation Pit Precipitation Engineering
Xiaopeng Wei
Abstract
Xiaopeng Wei
Abstract
The main building of Beihai Power Plant is located on dredger fill besides the sea.The water level is low and there are two aquifers-upper ground water aquifer and lower artesian aquifer.Well dewatering was accepted to lower the water level of the two aquifers.Based on Dupuit theory,the parameters of dewatering is designed.The practice proves the successfulness of the design.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main building of Beihai Power Plant is located on dredger fill besides the sea.The water level is low and there are two aquifers-upper ground water aquifer and lower artesian aquifer.Well dewatering was accepted to lower the water level of the two aquifers.Based on Dupuit theory,the parameters of dewatering is designed.The practice proves the successfulness of the design.
Key concepts: Dewatering, Artesian aquifer, Aquifer, Foundation (evidence), Geotechnical engineering, Geology, Groundwater, Aquifer test