2004•Yellow RiverRequires access

Suggestions on a General Plan for Lower Yellow River Management

Ren Zhang

Open publisher page 1 citations

Abstract

The secondary suspended river is a serious hidden trouble of flood control in the lower Yellow River. The lower Yellow River can be an alive river only changing the situation of high channel with low floodplain and removing the secondary suspended river. It can utilize the force of the nature and eliminate the serious present situation of the secondary suspended river in a quickly and better way only by demolishing production dykes. Demolishing production dykes should firstly build safe floodplain. Under such presupposition, the paper suggests to change the operational mode of the Xiaolangdi Reservoir, i.e. to impound major floods and not dominant small floods; to release muddy water and not clear water; to store less water in flood season, retain coarse sediment and drain off the find and; to utilize flooding for scouring the channel and use the floodplain for depositing the majority of coming sediment.

About this research paper

What this paper is about

The secondary suspended river is a serious hidden trouble of flood control in the lower Yellow River. The lower Yellow River can be an alive river only changing the situation of high channel with low floodplain and removing the secondary suspended river. It can utilize the force of the nature and eliminate the serious present situation of the secondary suspended river in a quickly and better way only by demolishing production dykes. Demolishing production dykes should firstly build safe floodplain. Under such presupposition, the paper suggests to change the operational mode of the Xiaolangdi Reservoir, i.e. to impound major floods and not dominant small floods; to release muddy water and not clear water; to store less water in flood season, retain coarse sediment and drain off the find and; to utilize flooding for scouring the channel and use the floodplain for depositing the majority of coming sediment.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The secondary suspended river is a serious hidden trouble of flood control in the lower Yellow River. The lower Yellow River can be an alive river only changing the situation of high channel with low floodplain and removing the secondary suspended river. It can utilize the force of the nature and eliminate the serious present situation of the secondary suspended river in a quickly and better way only by demolishing production dykes. Demolishing production dykes should firstly build safe floodplain. Under such presupposition, the paper suggests to change the operational mode of the Xiaolangdi Reservoir, i.e. to impound major floods and not dominant small floods; to release muddy water and not clear water; to store less water in flood season, retain coarse sediment and drain off the find and; to utilize flooding for scouring the channel and use the floodplain for depositing the majority of coming sediment.

Key concepts: Floodplain, Hydrology (agriculture), Channel (broadcasting), Flood myth, Flooding (psychology), Environmental science, Sediment, River regime

Related papers

Back to paper searchBrowse research topicsOriginal source
Suggestions on a General Plan for Lower Yellow River Management — Research Paper | ScholarLens