2008Drilling & Production TechnologyRequires access

APPLICATION OF INJECTION WELL CONTRASTING TEST IN INJECTION PROJECT ADJUSTMENT

Yan Chang-hui

Open publisher page 1 citations

Abstract

Water out is very serious in high water-cut late stage in Shuanghe oilfield development.In order to increase injection efficiency,it is very important to evaluate injection effectiveness accurately.Relationship between production well and injection well have been analyzed by injection well contrasting test.The results had been got that water injection rate is little and injection effect is unhomogeneous.Injection rate of V1,V8,V9,V10 reservoir should be increased.Injection rate of V6 should be decreased.The low permeability reservoir should carried out acidizing.

About this research paper

What this paper is about

Water out is very serious in high water-cut late stage in Shuanghe oilfield development.In order to increase injection efficiency,it is very important to evaluate injection effectiveness accurately.Relationship between production well and injection well have been analyzed by injection well contrasting test.The results had been got that water injection rate is little and injection effect is unhomogeneous.Injection rate of V1,V8,V9,V10 reservoir should be increased.Injection rate of V6 should be decreased.The low permeability reservoir should carried out acidizing.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Water out is very serious in high water-cut late stage in Shuanghe oilfield development.In order to increase injection efficiency,it is very important to evaluate injection effectiveness accurately.Relationship between production well and injection well have been analyzed by injection well contrasting test.The results had been got that water injection rate is little and injection effect is unhomogeneous.Injection rate of V1,V8,V9,V10 reservoir should be increased.Injection rate of V6 should be decreased.The low permeability reservoir should carried out acidizing.

Key concepts: Water injection (oil production), Petroleum engineering, Injection well, Water cut, Permeability (electromagnetism), Production rate, Stage (stratigraphy), Steam injection

Related papers

Back to paper searchBrowse research topicsOriginal source
APPLICATION OF INJECTION WELL CONTRASTING TEST IN INJECTION PROJECT ADJUSTMENT — Research Paper | ScholarLens