APPLICATION OF INJECTION WELL CONTRASTING TEST IN INJECTION PROJECT ADJUSTMENT
Yan Chang-hui
Abstract
Yan Chang-hui
Abstract
Water out is very serious in high water-cut late stage in Shuanghe oilfield development.In order to increase injection efficiency,it is very important to evaluate injection effectiveness accurately.Relationship between production well and injection well have been analyzed by injection well contrasting test.The results had been got that water injection rate is little and injection effect is unhomogeneous.Injection rate of V1,V8,V9,V10 reservoir should be increased.Injection rate of V6 should be decreased.The low permeability reservoir should carried out acidizing.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Water out is very serious in high water-cut late stage in Shuanghe oilfield development.In order to increase injection efficiency,it is very important to evaluate injection effectiveness accurately.Relationship between production well and injection well have been analyzed by injection well contrasting test.The results had been got that water injection rate is little and injection effect is unhomogeneous.Injection rate of V1,V8,V9,V10 reservoir should be increased.Injection rate of V6 should be decreased.The low permeability reservoir should carried out acidizing.
Key concepts: Water injection (oil production), Petroleum engineering, Injection well, Water cut, Permeability (electromagnetism), Production rate, Stage (stratigraphy), Steam injection