In course of the approaching excavation of underground works,the construction of new structure will change the mechanics case of existing structure and brings some bad influence.At the same time,the mechanical mode of newly-built structure is not the same as that single cavern is excavated in the half-unbounded space.Its original stress field is disturbed by former time and time again,and once more by excavating of later.A project is taken into account in this paper.By the three-dimensional elastoplastic finite element analysis,results show whether we should reinforce the old tunnel or not,it gives the suggestion,as well as whether the shield driving influences the orbit pitch of the old tunnel.It also simulates three pressure on the shield machine and how to influence the distortion and the principal stress.Finally,it makes the conclusion that may instruct the design and the construction of the project.

About this research paper

What this paper is about

In course of the approaching excavation of underground works,the construction of new structure will change the mechanics case of existing structure and brings some bad influence.At the same time,the mechanical mode of newly-built structure is not the same as that single cavern is excavated in the half-unbounded space.Its original stress field is disturbed by former time and time again,and once more by excavating of later.A project is taken into account in this paper.By the three-dimensional elastoplastic finite element analysis,results show whether we should reinforce the old tunnel or not,it gives the suggestion,as well as whether the shield driving influences the orbit pitch of the old tunnel.It also simulates three pressure on the shield machine and how to influence the distortion and the principal stress.Finally,it makes the conclusion that may instruct the design and the construction of the project.

Why it matters

OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In course of the approaching excavation of underground works,the construction of new structure will change the mechanics case of existing structure and brings some bad influence.At the same time,the mechanical mode of newly-built structure is not the same as that single cavern is excavated in the half-unbounded space.Its original stress field is disturbed by former time and time again,and once more by excavating of later.A project is taken into account in this paper.By the three-dimensional elastoplastic finite element analysis,results show whether we should reinforce the old tunnel or not,it gives the suggestion,as well as whether the shield driving influences the orbit pitch of the old tunnel.It also simulates three pressure on the shield machine and how to influence the distortion and the principal stress.Finally,it makes the conclusion that may instruct the design and the construction of the project.

Key concepts: Excavation, Shield, Finite element method, Principal stress, Distortion (music), Stress (linguistics), Structural engineering, Stress field