2010Shanxi ArchitectureRequires access

Mass concrete construction of platform of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation

LI Hong-y

Open publisher page 0 citations

Abstract

Combined with construction works of main pier bearing platform of continuous bridge overpass Yiyang expressway of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation of China railway 18th bureau,successful construction experiences of platform mass concrete under medium-high temperature weather conditions and complicated geological environment conditions are summarized.Many measures including optimization mix proportion design of concrete,cooling with pipe,double-mixing technology and so on are adopted,which complete the requirements of construction production and accumulate experiences for similar works.

About this research paper

What this paper is about

Combined with construction works of main pier bearing platform of continuous bridge overpass Yiyang expressway of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation of China railway 18th bureau,successful construction experiences of platform mass concrete under medium-high temperature weather conditions and complicated geological environment conditions are summarized.Many measures including optimization mix proportion design of concrete,cooling with pipe,double-mixing technology and so on are adopted,which complete the requirements of construction production and accumulate experiences for similar works.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combined with construction works of main pier bearing platform of continuous bridge overpass Yiyang expressway of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation of China railway 18th bureau,successful construction experiences of platform mass concrete under medium-high temperature weather conditions and complicated geological environment conditions are summarized.Many measures including optimization mix proportion design of concrete,cooling with pipe,double-mixing technology and so on are adopted,which complete the requirements of construction production and accumulate experiences for similar works.

Key concepts: Bridge (graph theory), Pier, Civil engineering, Engineering, Transport engineering, Railway line, Mass concrete, China

Related papers

Back to paper searchBrowse research topicsOriginal source
Mass concrete construction of platform of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation — Research Paper | ScholarLens