Mass concrete construction of platform of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation
LI Hong-y
Abstract
LI Hong-y
Abstract
Combined with construction works of main pier bearing platform of continuous bridge overpass Yiyang expressway of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation of China railway 18th bureau,successful construction experiences of platform mass concrete under medium-high temperature weather conditions and complicated geological environment conditions are summarized.Many measures including optimization mix proportion design of concrete,cooling with pipe,double-mixing technology and so on are adopted,which complete the requirements of construction production and accumulate experiences for similar works.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with construction works of main pier bearing platform of continuous bridge overpass Yiyang expressway of Zhumadian Bridge in Shijiazhuang-Wuhan special railway line for passenger transportation of China railway 18th bureau,successful construction experiences of platform mass concrete under medium-high temperature weather conditions and complicated geological environment conditions are summarized.Many measures including optimization mix proportion design of concrete,cooling with pipe,double-mixing technology and so on are adopted,which complete the requirements of construction production and accumulate experiences for similar works.
Key concepts: Bridge (graph theory), Pier, Civil engineering, Engineering, Transport engineering, Railway line, Mass concrete, China