On box girder construction technique of over-line railway
LI Shao-hon
Abstract
LI Shao-hon
Abstract
Taking super-large bridge project along Qinglin road as the example,the paper introduces the foundation treatment,the support structure,the load pre-loading,the manufacture of box girder model,the process of reinforcement and the concrete grouting of the upper continuous box girder cast-in-place construction of over-line bridge,and illustrates the technical measures in the construction,so as to accumulate the construction experience for the over-line bridge construction,so as to direct similar projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taking super-large bridge project along Qinglin road as the example,the paper introduces the foundation treatment,the support structure,the load pre-loading,the manufacture of box girder model,the process of reinforcement and the concrete grouting of the upper continuous box girder cast-in-place construction of over-line bridge,and illustrates the technical measures in the construction,so as to accumulate the construction experience for the over-line bridge construction,so as to direct similar projects.
Key concepts: Box girder, Bridge (graph theory), Engineering, Structural engineering, Foundation (evidence), Girder bridge, Line (geometry), Civil engineering