Monitoring and Analysis of Influence of Pile Foundation under High-rise Buildings on Adjacent Tunnel

Xiaoming Lou

Open publisher page 4 citations

Abstract

During construction of high-rise buildings, deformation of adjacent tunnel was monitored. The influence of pile foundation under high-rise buildings on adjacent tunnel is analyzed. Additional settlements of tunnel due to the influence of pile foundation are obviously less than monitoring data. Most far monitoring point is about 1 pile length to the main building,and can be approximately considered at influence edge of the main pile foundation. If the measured settlement of 7 monitor points is relative to the most far monitoring point,the predicted additional settlements are in agreement with the result measured. It is indicated that there are other factors leading to additional settlements. Possibility of the influence of land subsidence and subsidence by vibration to tunnel is discussed. Land subsidence has reduced the measured settlement of the long pile foundation.

About this research paper

What this paper is about

During construction of high-rise buildings, deformation of adjacent tunnel was monitored. The influence of pile foundation under high-rise buildings on adjacent tunnel is analyzed. Additional settlements of tunnel due to the influence of pile foundation are obviously less than monitoring data. Most far monitoring point is about 1 pile length to the main building,and can be approximately considered at influence edge of the main pile foundation. If the measured settlement of 7 monitor points is relative to the most far monitoring point,the predicted additional settlements are in agreement with the result measured. It is indicated that there are other factors leading to additional settlements. Possibility of the influence of land subsidence and subsidence by vibration to tunnel is discussed. Land subsidence has reduced the measured settlement of the long pile foundation.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

During construction of high-rise buildings, deformation of adjacent tunnel was monitored. The influence of pile foundation under high-rise buildings on adjacent tunnel is analyzed. Additional settlements of tunnel due to the influence of pile foundation are obviously less than monitoring data. Most far monitoring point is about 1 pile length to the main building,and can be approximately considered at influence edge of the main pile foundation. If the measured settlement of 7 monitor points is relative to the most far monitoring point,the predicted additional settlements are in agreement with the result measured. It is indicated that there are other factors leading to additional settlements. Possibility of the influence of land subsidence and subsidence by vibration to tunnel is discussed. Land subsidence has reduced the measured settlement of the long pile foundation.

Key concepts: Pile, Foundation (evidence), Settlement (finance), Subsidence, Human settlement, Geotechnical engineering, Geology, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Monitoring and Analysis of Influence of Pile Foundation under High-rise Buildings on Adjacent Tunnel — Research Paper | ScholarLens