2014Tunnel ConstructionRequires access

Key Construction Technologies for Shield-bored Tunnel of Chegongmiao Station-Hongshuwan Station Section on No. 11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line

LI Jiansh

Open publisher page 2 citations

Abstract

In recent years,it is normal that tunnels under construction cross closely above existing Metro structure in urban areas. As a result,studies on the control of the deformation of the existing structure become a hot topic. In the construction of the shield-bored tunnel of Chegongmiao station-Hongshuwan station section on No. 11 line of Shenzhen Metro,which crosses closely above the existing Zhuzilin station-Qiaochengdong station of No. 1 line of Shenzhen Metro, technologies,such as reinforcement of ground above the existing Metro line,shield boring control technology and existing structure monitoring technology,are used. In the end,the deformation of the existing structure has been brought under effective control,and the safety of the shield-bored tunnel and the operation of the existing Metro line have been guaranteed.

About this research paper

What this paper is about

In recent years,it is normal that tunnels under construction cross closely above existing Metro structure in urban areas. As a result,studies on the control of the deformation of the existing structure become a hot topic. In the construction of the shield-bored tunnel of Chegongmiao station-Hongshuwan station section on No. 11 line of Shenzhen Metro,which crosses closely above the existing Zhuzilin station-Qiaochengdong station of No. 1 line of Shenzhen Metro, technologies,such as reinforcement of ground above the existing Metro line,shield boring control technology and existing structure monitoring technology,are used. In the end,the deformation of the existing structure has been brought under effective control,and the safety of the shield-bored tunnel and the operation of the existing Metro line have been guaranteed.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In recent years,it is normal that tunnels under construction cross closely above existing Metro structure in urban areas. As a result,studies on the control of the deformation of the existing structure become a hot topic. In the construction of the shield-bored tunnel of Chegongmiao station-Hongshuwan station section on No. 11 line of Shenzhen Metro,which crosses closely above the existing Zhuzilin station-Qiaochengdong station of No. 1 line of Shenzhen Metro, technologies,such as reinforcement of ground above the existing Metro line,shield boring control technology and existing structure monitoring technology,are used. In the end,the deformation of the existing structure has been brought under effective control,and the safety of the shield-bored tunnel and the operation of the existing Metro line have been guaranteed.

Key concepts: Shield, Metro station, Section (typography), Engineering, Line (geometry), Dedicated line, Civil engineering, Key (lock)

Related papers

Back to paper searchBrowse research topicsOriginal source
Key Construction Technologies for Shield-bored Tunnel of Chegongmiao Station-Hongshuwan Station Section on No. 11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line — Research Paper | ScholarLens