Key Construction Technologies for Shield-bored Tunnel of Chegongmiao Station-Hongshuwan Station Section on No. 11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line
LI Jiansh
Abstract
LI Jiansh
Abstract
In recent years,it is normal that tunnels under construction cross closely above existing Metro structure in urban areas. As a result,studies on the control of the deformation of the existing structure become a hot topic. In the construction of the shield-bored tunnel of Chegongmiao station-Hongshuwan station section on No. 11 line of Shenzhen Metro,which crosses closely above the existing Zhuzilin station-Qiaochengdong station of No. 1 line of Shenzhen Metro, technologies,such as reinforcement of ground above the existing Metro line,shield boring control technology and existing structure monitoring technology,are used. In the end,the deformation of the existing structure has been brought under effective control,and the safety of the shield-bored tunnel and the operation of the existing Metro line have been guaranteed.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In recent years,it is normal that tunnels under construction cross closely above existing Metro structure in urban areas. As a result,studies on the control of the deformation of the existing structure become a hot topic. In the construction of the shield-bored tunnel of Chegongmiao station-Hongshuwan station section on No. 11 line of Shenzhen Metro,which crosses closely above the existing Zhuzilin station-Qiaochengdong station of No. 1 line of Shenzhen Metro, technologies,such as reinforcement of ground above the existing Metro line,shield boring control technology and existing structure monitoring technology,are used. In the end,the deformation of the existing structure has been brought under effective control,and the safety of the shield-bored tunnel and the operation of the existing Metro line have been guaranteed.
Key concepts: Shield, Metro station, Section (typography), Engineering, Line (geometry), Dedicated line, Civil engineering, Key (lock)