Since impoundment on June 1,2003,the Three Gorges Reservoir(TGR) began to play comprehensive roles in flood control,power generation,and navigation,etc.In order to study the changes of erosion,hydrological response,relationship between river and lake,variations in the condition of water and sediment movements in the Dongting Lake area since the operation of TGR.Hydrological and sediment observation data were analyzed systematically to understand the water and sediment in-and-out of the TGR.In addition,by applying the BP Neural network,variation coefficient and accumulation curve of water and sediment were calculated or depicted,to study the material transportation from the Dongting Lake to the Changjiang(Yangtze) River,and the variation of water and sediment within the lake.Results show that:(1) in inter-annual and inter-decadal scales,reduction of precipitation in the upper reaches of Changjiang River and the construction activities of TGR are the main factors causing variation of materials in the lake;(2) the sharp decrease of flow-in water and sediment downstream the TGR has caused siltation at the Sankou Section(the three outlets of Jingjiang River) and the demise of other two tributaries who are no longer function as a normal river; and(3) the accumulated amount of sediment in Dongting Lake in 2003—2011 is merely 2301×104 t,a 95.6% reduction of that in 1994—2002.In addition,using BP neural network could simulate precisely the amount the runoff and sediment in Dongting Lake,providing a tool for effective utilization and scientific management over the complicated river-basin system.

About this research paper

What this paper is about

Since impoundment on June 1,2003,the Three Gorges Reservoir(TGR) began to play comprehensive roles in flood control,power generation,and navigation,etc.In order to study the changes of erosion,hydrological response,relationship between river and lake,variations in the condition of water and sediment movements in the Dongting Lake area since the operation of TGR.Hydrological and sediment observation data were analyzed systematically to understand the water and sediment in-and-out of the TGR.In addition,by applying the BP Neural network,variation coefficient and accumulation curve of water and sediment were calculated or depicted,to study the material transportation from the Dongting Lake to the Changjiang(Yangtze) River,and the variation of water and sediment within the lake.Results show that:(1) in inter-annual and inter-decadal scales,reduction of precipitation in the upper reaches of Changjiang River and the construction activities of TGR are the main factors causing variation of materials in the lake;(2) the sharp decrease of flow-in water and sediment downstream the TGR has caused siltation at the Sankou Section(the three outlets of Jingjiang River) and the demise of other two tributaries who are no longer function as a normal river; and(3) the accumulated amount of sediment in Dongting Lake in 2003—2011 is merely 2301×104 t,a 95.6% reduction of that in 1994—2002.In addition,using BP neural network could simulate precisely the amount the runoff and sediment in Dongting Lake,providing a tool for effective utilization and scientific management over the complicated river-basin system.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Since impoundment on June 1,2003,the Three Gorges Reservoir(TGR) began to play comprehensive roles in flood control,power generation,and navigation,etc.In order to study the changes of erosion,hydrological response,relationship between river and lake,variations in the condition of water and sediment movements in the Dongting Lake area since the operation of TGR.Hydrological and sediment observation data were analyzed systematically to understand the water and sediment in-and-out of the TGR.In addition,by applying the BP Neural network,variation coefficient and accumulation curve of water and sediment were calculated or depicted,to study the material transportation from the Dongting Lake to the Changjiang(Yangtze) River,and the variation of water and sediment within the lake.Results show that:(1) in inter-annual and inter-decadal scales,reduction of precipitation in the upper reaches of Changjiang River and the construction activities of TGR are the main factors causing variation of materials in the lake;(2) the sharp decrease of flow-in water and sediment downstream the TGR has caused siltation at the Sankou Section(the three outlets of Jingjiang River) and the demise of other two tributaries who are no longer function as a normal river; and(3) the accumulated amount of sediment in Dongting Lake in 2003—2011 is merely 2301×104 t,a 95.6% reduction of that in 1994—2002.In addition,using BP neural network could simulate precisely the amount the runoff and sediment in Dongting Lake,providing a tool for effective utilization and scientific management over the complicated river-basin system.

Key concepts: Siltation, Tributary, Hydrology (agriculture), Sediment, Environmental science, Surface runoff, Water level, Erosion

Related papers

Back to paper searchBrowse research topicsOriginal source
THE IMPACT ANALYSIS OF THE RELATIONS BETWEEN DONGTING LAKE AND THE THREE OUTLETS OF JINGJIANG RIVER AFTER THE THREE GORGES PROJECT OPERATION — Research Paper | ScholarLens