Design for the Strengthening of the Main Girder with a Span Length of 49.5m of the Main Bridge of Zhaobaoshan Bridge in Ningbo
Hua Zhu
Abstract
Hua Zhu
Abstract
Many regular cracks were found during the construction of 49.5 m span main girder of the main bridge of Zhaobaoshan birdge. The cause of the crack formation and the method of strengthening are introduced. The cracked girder was strengthened with longitudinal stringers and cross beams built in it and external prestressed tendons to insure its bearing capacity.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Many regular cracks were found during the construction of 49.5 m span main girder of the main bridge of Zhaobaoshan birdge. The cause of the crack formation and the method of strengthening are introduced. The cracked girder was strengthened with longitudinal stringers and cross beams built in it and external prestressed tendons to insure its bearing capacity.
Key concepts: Girder, Structural engineering, Bridge (graph theory), Span (engineering), Engineering, Beam bridge, Girder bridge, Prestressed concrete