Fast Excavation in Rock Laneway of Xuchang Coal Mine
Enpu Li
Abstract
Enpu Li
Abstract
At present,the excavation level of rock laneway is low,which badly influences the continuous production of coal mine.Aiming at the main factor which restricts the excavation level of rock laneway of Xuchang Coal Mine, the original operation mold two times of excavations and one gunite is changed into the new onethree times of excavations and gunites.At the same time,the original blasting parameters and strengthens labor organization are optimized.The purpose of increasing drilling footages per month is ultimately realized.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
At present,the excavation level of rock laneway is low,which badly influences the continuous production of coal mine.Aiming at the main factor which restricts the excavation level of rock laneway of Xuchang Coal Mine, the original operation mold two times of excavations and one gunite is changed into the new onethree times of excavations and gunites.At the same time,the original blasting parameters and strengthens labor organization are optimized.The purpose of increasing drilling footages per month is ultimately realized.
Key concepts: Excavation, Drilling and blasting, Rock blasting, Mining engineering, Coal mining, Drilling, Coal, Geotechnical engineering