Fast Excavation in Rock Laneway of Xuchang Coal Mine

Enpu Li

Open publisher page 0 citations

Abstract

At present,the excavation level of rock laneway is low,which badly influences the continuous production of coal mine.Aiming at the main factor which restricts the excavation level of rock laneway of Xuchang Coal Mine, the original operation mold two times of excavations and one gunite is changed into the new onethree times of excavations and gunites.At the same time,the original blasting parameters and strengthens labor organization are optimized.The purpose of increasing drilling footages per month is ultimately realized.

About this research paper

What this paper is about

At present,the excavation level of rock laneway is low,which badly influences the continuous production of coal mine.Aiming at the main factor which restricts the excavation level of rock laneway of Xuchang Coal Mine, the original operation mold two times of excavations and one gunite is changed into the new onethree times of excavations and gunites.At the same time,the original blasting parameters and strengthens labor organization are optimized.The purpose of increasing drilling footages per month is ultimately realized.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

At present,the excavation level of rock laneway is low,which badly influences the continuous production of coal mine.Aiming at the main factor which restricts the excavation level of rock laneway of Xuchang Coal Mine, the original operation mold two times of excavations and one gunite is changed into the new onethree times of excavations and gunites.At the same time,the original blasting parameters and strengthens labor organization are optimized.The purpose of increasing drilling footages per month is ultimately realized.

Key concepts: Excavation, Drilling and blasting, Rock blasting, Mining engineering, Coal mining, Drilling, Coal, Geotechnical engineering