The No.1 tunnel of some main canal in Xinjiang belongs to the shallow buried water-conveyance tunnel through sand and gravel extreme soft rock, the construction scheme of setting oblique branch tunnel to increase the two work surfaces is adopted for the tunnel. There are many troubles in the construction of the oblique branch tunnel, such as the area limit, surrounding rock with shallow buried, high permeability and bad cementation of the sand and gravel layer, and so on. The appropriate process and method are found out gradually through the multistep adjustment and improvement for the construction scheme, which could obtain the better results in the aspects of the construction progress and the investment.

About this research paper

What this paper is about

The No.1 tunnel of some main canal in Xinjiang belongs to the shallow buried water-conveyance tunnel through sand and gravel extreme soft rock, the construction scheme of setting oblique branch tunnel to increase the two work surfaces is adopted for the tunnel. There are many troubles in the construction of the oblique branch tunnel, such as the area limit, surrounding rock with shallow buried, high permeability and bad cementation of the sand and gravel layer, and so on. The appropriate process and method are found out gradually through the multistep adjustment and improvement for the construction scheme, which could obtain the better results in the aspects of the construction progress and the investment.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The No.1 tunnel of some main canal in Xinjiang belongs to the shallow buried water-conveyance tunnel through sand and gravel extreme soft rock, the construction scheme of setting oblique branch tunnel to increase the two work surfaces is adopted for the tunnel. There are many troubles in the construction of the oblique branch tunnel, such as the area limit, surrounding rock with shallow buried, high permeability and bad cementation of the sand and gravel layer, and so on. The appropriate process and method are found out gradually through the multistep adjustment and improvement for the construction scheme, which could obtain the better results in the aspects of the construction progress and the investment.

Key concepts: Geotechnical engineering, Geology, Tunnel construction, Cementation (geology), Engineering, Mining engineering, Geography, Cement

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on optimization measures of branch tunnel construction scheme of some soft rock tunnel in Xinjiang — Research Paper | ScholarLens