Abstract

By analyzing the principle of entropy method and fuzzy comprehensive evaluation method, combine the two methods,avoid the error caused by human and the uncertainty of the weighting,and combining with concrete project example,the methods above are used in construction of underground cavern group scheme is selected. By reference [3]in the raw data,and the effect than the literature [3]is considered more indicators,construction schedule,a calculation scheme of the comprehensive evaluation value,the optimization of the sequence and the literature [3]is a little difference. But the optimal scheme is consistent,and the literature [3]concluded that the optimal scheme of identification degree is higher,can provide more realistic decision makers for construction construction scheme selection basis.

About this research paper

What this paper is about

By analyzing the principle of entropy method and fuzzy comprehensive evaluation method, combine the two methods,avoid the error caused by human and the uncertainty of the weighting,and combining with concrete project example,the methods above are used in construction of underground cavern group scheme is selected. By reference [3]in the raw data,and the effect than the literature [3]is considered more indicators,construction schedule,a calculation scheme of the comprehensive evaluation value,the optimization of the sequence and the literature [3]is a little difference. But the optimal scheme is consistent,and the literature [3]concluded that the optimal scheme of identification degree is higher,can provide more realistic decision makers for construction construction scheme selection basis.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

By analyzing the principle of entropy method and fuzzy comprehensive evaluation method, combine the two methods,avoid the error caused by human and the uncertainty of the weighting,and combining with concrete project example,the methods above are used in construction of underground cavern group scheme is selected. By reference [3]in the raw data,and the effect than the literature [3]is considered more indicators,construction schedule,a calculation scheme of the comprehensive evaluation value,the optimization of the sequence and the literature [3]is a little difference. But the optimal scheme is consistent,and the literature [3]concluded that the optimal scheme of identification degree is higher,can provide more realistic decision makers for construction construction scheme selection basis.

Key concepts: Weighting, Entropy (arrow of time), Scheme (mathematics), Fuzzy logic, Computer science, Selection (genetic algorithm), Mathematical optimization, Schedule

Related papers

Back to paper searchBrowse research topicsOriginal source
Entropy Method in Scheme Selection of Construction of Large Underground Cavern Group — Research Paper | ScholarLens