2006Shanxi ArchitectureRequires access

The application of post grouting technique of cast-in-place bored pile

Ren Ji-ron

Open publisher page 0 citations

Abstract

Taking practical work in one commercial square as example the principle,construction method and related technical key points are introduced for post grouting construction,which provide good references for similar works in the future.

About this research paper

What this paper is about

Taking practical work in one commercial square as example the principle,construction method and related technical key points are introduced for post grouting construction,which provide good references for similar works in the future.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Taking practical work in one commercial square as example the principle,construction method and related technical key points are introduced for post grouting construction,which provide good references for similar works in the future.

Key concepts: Pile, Key (lock), Work (physics), Forensic engineering, Engineering, Civil engineering, Square (algebra), Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The application of post grouting technique of cast-in-place bored pile — Research Paper | ScholarLens