Method and Accuracy of Declivity Survey Based on Total Station Instrument
Jiang Xian-dong
Abstract
Jiang Xian-dong
Abstract
The building's stability and reliability have become the people's focus along with its continuous hightening and broadening.The inclination is one of the key factors used to judge the construction technique and quality.However,the traditional observation ways,for example,the small angle observation method and transit projection method,as be confined with the instrument's accuracy and surveying condition,can't reach a very high precision.The procedure and method for declivity survey based on the total station instrument are introduced here,then the precision is analyzed.The practical experience confirms that it can predigest the outside works and improve the work efficiency.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The building's stability and reliability have become the people's focus along with its continuous hightening and broadening.The inclination is one of the key factors used to judge the construction technique and quality.However,the traditional observation ways,for example,the small angle observation method and transit projection method,as be confined with the instrument's accuracy and surveying condition,can't reach a very high precision.The procedure and method for declivity survey based on the total station instrument are introduced here,then the precision is analyzed.The practical experience confirms that it can predigest the outside works and improve the work efficiency.
Key concepts: Reliability (semiconductor), Focus (optics), Projection (relational algebra), Total station, Key (lock), Quality (philosophy), Work (physics), Transit (satellite)