Cause analysis and prevention measures of bumping at bridge-head in highway
Kong Le
Abstract
Kong Le
Abstract
The author analyzes the cause of the bumping at bridge-head in the highway,points out that the soft foundation treatment after the abutment is the important measure to prevent and control the bumping at bridge-head,introduces the methods to treat the uneven settlement of the abutment and the embankment,describes the construction technology and design of the abutment embankment,to solve the problem of the bumping at bridge-head.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The author analyzes the cause of the bumping at bridge-head in the highway,points out that the soft foundation treatment after the abutment is the important measure to prevent and control the bumping at bridge-head,introduces the methods to treat the uneven settlement of the abutment and the embankment,describes the construction technology and design of the abutment embankment,to solve the problem of the bumping at bridge-head.
Key concepts: Bumping, Abutment, Bridge (graph theory), Head (geology), Settlement (finance), Engineering, Forensic engineering, Levee