Research on the Operation Way of Hydropower Station with Long-distance Diversion Tunnel and Dual Holes
Yu Pin
Abstract
Yu Pin
Abstract
Hydropower station with long-distance diversion tunnel and dual holes is widely used for its low investment and high hydropower utilization,and to choose the operation way of hydropower stations is more difficult because of large hydropower wave and complex hydraulic disturbance.This paper introduces in detail the starting up of the station unit,load adjustment,governor operation and the structure of security and stability control system of hydropower station with dual hole.It possesses the directing significance for similar operation way of hydropower stations.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Hydropower station with long-distance diversion tunnel and dual holes is widely used for its low investment and high hydropower utilization,and to choose the operation way of hydropower stations is more difficult because of large hydropower wave and complex hydraulic disturbance.This paper introduces in detail the starting up of the station unit,load adjustment,governor operation and the structure of security and stability control system of hydropower station with dual hole.It possesses the directing significance for similar operation way of hydropower stations.
Key concepts: Hydropower, Governor, Dual (grammatical number), Unit (ring theory), Water diversion, Engineering, Civil engineering, Marine engineering