Construction Scheme for a Long Span and Wide Deck Cable-Stayed Bridge over Deep Water

Hongyu Jia

Open publisher page 0 citations

Abstract

The Lushan Bridge totals 1 502 m in length and its main bridge is a double-pylon and single-cable-plane prestressed concrete cable-stayed bridge with span arrangement(118+256+118) m and deck width 33 m.In the light of the characteristics that the water at the location of the Bridge is deep,the span of the Bridge is long and the deck is wide and on the basis of the comparison of different constructions schemes,it is determined that the final construction scheme that should be adopted for the Bridge is as follows: the large diameter bored pile foundations are to be constructed on the trestle and on the platforms supported on the steel pipe piles and steel casings in water;the massive concrete circular pile caps are to be constructed by the steel boxed cofferdams,the twin-leg thin-walled piers are to be constructed by the turnover formwork,the single column pylons are to be constructed by the climbing formwork and the wide-flange and inversely trapezoid 5-cell single box main girder is to be cantileveredly cast in situ by the rear-anchored diamond-shape form travelers.Practice proves that the adopted construction scheme is appropriate and can meet the quality and construction time schedule requirements.

About this research paper

What this paper is about

The Lushan Bridge totals 1 502 m in length and its main bridge is a double-pylon and single-cable-plane prestressed concrete cable-stayed bridge with span arrangement(118+256+118) m and deck width 33 m.In the light of the characteristics that the water at the location of the Bridge is deep,the span of the Bridge is long and the deck is wide and on the basis of the comparison of different constructions schemes,it is determined that the final construction scheme that should be adopted for the Bridge is as follows: the large diameter bored pile foundations are to be constructed on the trestle and on the platforms supported on the steel pipe piles and steel casings in water;the massive concrete circular pile caps are to be constructed by the steel boxed cofferdams,the twin-leg thin-walled piers are to be constructed by the turnover formwork,the single column pylons are to be constructed by the climbing formwork and the wide-flange and inversely trapezoid 5-cell single box main girder is to be cantileveredly cast in situ by the rear-anchored diamond-shape form travelers.Practice proves that the adopted construction scheme is appropriate and can meet the quality and construction time schedule requirements.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Lushan Bridge totals 1 502 m in length and its main bridge is a double-pylon and single-cable-plane prestressed concrete cable-stayed bridge with span arrangement(118+256+118) m and deck width 33 m.In the light of the characteristics that the water at the location of the Bridge is deep,the span of the Bridge is long and the deck is wide and on the basis of the comparison of different constructions schemes,it is determined that the final construction scheme that should be adopted for the Bridge is as follows: the large diameter bored pile foundations are to be constructed on the trestle and on the platforms supported on the steel pipe piles and steel casings in water;the massive concrete circular pile caps are to be constructed by the steel boxed cofferdams,the twin-leg thin-walled piers are to be constructed by the turnover formwork,the single column pylons are to be constructed by the climbing formwork and the wide-flange and inversely trapezoid 5-cell single box main girder is to be cantileveredly cast in situ by the rear-anchored diamond-shape form travelers.Practice proves that the adopted construction scheme is appropriate and can meet the quality and construction time schedule requirements.

Key concepts: Formwork, Structural engineering, Span (engineering), Cofferdam, Deck, Engineering, Pylon, Prestressed concrete

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Scheme for a Long Span and Wide Deck Cable-Stayed Bridge over Deep Water — Research Paper | ScholarLens