Construction Technology for the Liujiang Flyover of the Jingzhu Expressway
Yunshan Li
Abstract
Yunshan Li
Abstract
The outline of the Liujiang Cloverleaf Junction of the Jingzhu Expressway is presented in this paper, with the traffic split-flow technique, military standard equipment, and the vertical adjustable two-way support system, construction techniques for small-radius reinforced concrete box girders and linear control technique adopted during the construction of the flyover described in detail. Our practice shows that the application of these techniques has effectively ensured safety, quality and the construction duration and gained satisfactory economic results.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The outline of the Liujiang Cloverleaf Junction of the Jingzhu Expressway is presented in this paper, with the traffic split-flow technique, military standard equipment, and the vertical adjustable two-way support system, construction techniques for small-radius reinforced concrete box girders and linear control technique adopted during the construction of the flyover described in detail. Our practice shows that the application of these techniques has effectively ensured safety, quality and the construction duration and gained satisfactory economic results.
Key concepts: Engineering, Girder, Box girder, Quality (philosophy), Civil engineering, RADIUS, Transport engineering, Construction engineering