2011Coal EngineeringRequires access

Study on Fully Mechanized Top Coal Caving Slicing Mining Technology of Ultra Thick Seam Under Water Body

Shangzhi Li

Open publisher page 0 citations

Abstract

Base on the analysis on the mining and topography and other condition of the Chenjiagou Mine in Huating Mining Area,the high pressurized water input in the upward deep hole,built-in gas transportation,double end sealing,constant pressure leakage measuring equipment were selected for the observation of the water flow crack zone height in the overburden strata of No.3201 and No.3202 fully mechanized top coal caving mining faces in the slices of thick seam of Chenjiagou Mine.The max cracking and mining ratio observed was 11.39.in combination with the numerical simulation analysis and the surface ground crack observation results,a formula to calculate the coal and rock pillar thickness for safety mining under the river was analyzed and provided for the fully mechanized top coal caving mining in slice of the ultra thick seam in Chenjiagou Mine.The study achievements provided the reliable basis to the safety mining under the water body in Huating Mining Area.

About this research paper

What this paper is about

Base on the analysis on the mining and topography and other condition of the Chenjiagou Mine in Huating Mining Area,the high pressurized water input in the upward deep hole,built-in gas transportation,double end sealing,constant pressure leakage measuring equipment were selected for the observation of the water flow crack zone height in the overburden strata of No.3201 and No.3202 fully mechanized top coal caving mining faces in the slices of thick seam of Chenjiagou Mine.The max cracking and mining ratio observed was 11.39.in combination with the numerical simulation analysis and the surface ground crack observation results,a formula to calculate the coal and rock pillar thickness for safety mining under the river was analyzed and provided for the fully mechanized top coal caving mining in slice of the ultra thick seam in Chenjiagou Mine.The study achievements provided the reliable basis to the safety mining under the water body in Huating Mining Area.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Base on the analysis on the mining and topography and other condition of the Chenjiagou Mine in Huating Mining Area,the high pressurized water input in the upward deep hole,built-in gas transportation,double end sealing,constant pressure leakage measuring equipment were selected for the observation of the water flow crack zone height in the overburden strata of No.3201 and No.3202 fully mechanized top coal caving mining faces in the slices of thick seam of Chenjiagou Mine.The max cracking and mining ratio observed was 11.39.in combination with the numerical simulation analysis and the surface ground crack observation results,a formula to calculate the coal and rock pillar thickness for safety mining under the river was analyzed and provided for the fully mechanized top coal caving mining in slice of the ultra thick seam in Chenjiagou Mine.The study achievements provided the reliable basis to the safety mining under the water body in Huating Mining Area.

Key concepts: Overburden, Coal mining, Mining engineering, Slicing, Pillar, Coal, Surface mining, Problems in coal mining

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Fully Mechanized Top Coal Caving Slicing Mining Technology of Ultra Thick Seam Under Water Body — Research Paper | ScholarLens