Panjin Junction Interchange Cast-in-situ Continuous Box Girder Construction
Wang Yu-gu
Abstract
Wang Yu-gu
Abstract
The article introduces the Fu-PAn Highway Engineering eighth contract section Panjin junction interchange cast-in-situ continuous box girder construction technology,which provides valuable experiecnes for the future cast-in-situ prestressed concrete continuous box girder construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The article introduces the Fu-PAn Highway Engineering eighth contract section Panjin junction interchange cast-in-situ continuous box girder construction technology,which provides valuable experiecnes for the future cast-in-situ prestressed concrete continuous box girder construction.
Key concepts: Box girder, Engineering, Structural engineering, In situ, Section (typography), Girder, Geotechnical engineering, Computer science