2004•Engineering BlastingRequires access

STUDY ON INFLUENCE OF BLASTING VIBRATION FROM EXCAVATION OF A NEW TUNNEL ON EXISTED TUNNEL

Jianhui Zhong

Open publisher page 4 citations

Abstract

Based on the principle of finite-element method,the influence of blasting vibration from excavation of a new tunnel on close-in existed tunnel is studied by use of the ANSYS program.The vibrations of existed tunnels in different country rocks are analyzed at different spacing distances of tunnels.The results of study and analysis show that:(a)the sidewall of the existed tunnel in the face of blasting has a maximum vibration velocity;(b)the solider country rock is,the lower vibration velocity;(c)the vibration velocity of tunnel's lining will exceed the permitted vibration velocity if the spacing distance is less than one-fold of tunnel diameter;(d)the relation between vibration velocity of country rock and the distance to an explosion source is nonlinear.

About this research paper

What this paper is about

Based on the principle of finite-element method,the influence of blasting vibration from excavation of a new tunnel on close-in existed tunnel is studied by use of the ANSYS program.The vibrations of existed tunnels in different country rocks are analyzed at different spacing distances of tunnels.The results of study and analysis show that:(a)the sidewall of the existed tunnel in the face of blasting has a maximum vibration velocity;(b)the solider country rock is,the lower vibration velocity;(c)the vibration velocity of tunnel's lining will exceed the permitted vibration velocity if the spacing distance is less than one-fold of tunnel diameter;(d)the relation between vibration velocity of country rock and the distance to an explosion source is nonlinear.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the principle of finite-element method,the influence of blasting vibration from excavation of a new tunnel on close-in existed tunnel is studied by use of the ANSYS program.The vibrations of existed tunnels in different country rocks are analyzed at different spacing distances of tunnels.The results of study and analysis show that:(a)the sidewall of the existed tunnel in the face of blasting has a maximum vibration velocity;(b)the solider country rock is,the lower vibration velocity;(c)the vibration velocity of tunnel's lining will exceed the permitted vibration velocity if the spacing distance is less than one-fold of tunnel diameter;(d)the relation between vibration velocity of country rock and the distance to an explosion source is nonlinear.

Key concepts: Vibration, Excavation, Rock blasting, Geotechnical engineering, Engineering, Structural engineering, Geology, Acoustics

Related papers

Back to paper searchBrowse research topicsOriginal source
STUDY ON INFLUENCE OF BLASTING VIBRATION FROM EXCAVATION OF A NEW TUNNEL ON EXISTED TUNNEL — Research Paper | ScholarLens