Analysis and information construction of foundation pit for Shipaiqiao subway station in Guangzhou
Gao Jun-yue
Abstract
Gao Jun-yue
Abstract
The continuous cut-cast pile is adopted for the foundation pit of Shipaiqiao Subway Station in Guangzhou city.The optimal calculation has been made for the sparse piles with 2.0 m distance between the neighboring piles of φ 1 200 mm while the foundation safety is guaranteed.The monitoring design is brought out in detail in order to guarantee foundation safety on account of complex environment around the foundation;the comprehensive data are gotten and used for construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The continuous cut-cast pile is adopted for the foundation pit of Shipaiqiao Subway Station in Guangzhou city.The optimal calculation has been made for the sparse piles with 2.0 m distance between the neighboring piles of φ 1 200 mm while the foundation safety is guaranteed.The monitoring design is brought out in detail in order to guarantee foundation safety on account of complex environment around the foundation;the comprehensive data are gotten and used for construction.
Key concepts: Foundation (evidence), Pile, Subway station, Engineering, Civil engineering, Geotechnical engineering, Transport engineering, Geography