2004•Unpublished venueRequires access

Safety analysis of water conveyance to Shentongzui Reservoir in winter by water diversion project from Yellow River to Shanxi Province

LI Wen-fang

Open publisher page 1 citations

Abstract

This work is done to provide a basis to determine whether the heat insulating measure should be taken at the Shentongzui Reservoir. With consideration of the water temperature variation in the reservoir, calculation models for freezing time of the water body and outflow temperature of the reservoir are developed based on the shapes of ice scraps and ice covers, and the freezing time and outflow temperature are calculated. The results show that the freezing time depends on the water level and inflow temperature of the reservoir, and the water level has greater influences, and that, if an effective ice cover is formed, it is unnecessary to take any heat insulating measures.

About this research paper

What this paper is about

This work is done to provide a basis to determine whether the heat insulating measure should be taken at the Shentongzui Reservoir. With consideration of the water temperature variation in the reservoir, calculation models for freezing time of the water body and outflow temperature of the reservoir are developed based on the shapes of ice scraps and ice covers, and the freezing time and outflow temperature are calculated. The results show that the freezing time depends on the water level and inflow temperature of the reservoir, and the water level has greater influences, and that, if an effective ice cover is formed, it is unnecessary to take any heat insulating measures.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This work is done to provide a basis to determine whether the heat insulating measure should be taken at the Shentongzui Reservoir. With consideration of the water temperature variation in the reservoir, calculation models for freezing time of the water body and outflow temperature of the reservoir are developed based on the shapes of ice scraps and ice covers, and the freezing time and outflow temperature are calculated. The results show that the freezing time depends on the water level and inflow temperature of the reservoir, and the water level has greater influences, and that, if an effective ice cover is formed, it is unnecessary to take any heat insulating measures.

Key concepts: Outflow, Inflow, Environmental science, Water diversion, Hydrology (agriculture), Ice formation, Water body, Work (physics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Safety analysis of water conveyance to Shentongzui Reservoir in winter by water diversion project from Yellow River to Shanxi Province — Research Paper | ScholarLens