2015•Journal of Henan University of Urban ConstructionRequires access

Highway cost estimation system based on terrain

Huang Luo-nin

Open publisher page 0 citations

Abstract

As in the case of known corridor belt,the highway construction cost is predicted,which helps to limit the implementation of the design. Based on nearly 10 years of highway construction projects in Fujian province,the ones which have a great impact on the cost of the project are extracted from each project,including pricing earthwork,engineering denominated stonework,protecting works,drainage works,bridge construction,tunnel construction and the corresponding terrain index parameters. SPSS is used to do the correlation analysis and analyzes the key indicators terrain which controls the five quantities. And the example shows that the model can predict effectively 5 quantities in different terrain conditions and reasonable value of the total cost,with high precision,easy to operate.

About this research paper

What this paper is about

As in the case of known corridor belt,the highway construction cost is predicted,which helps to limit the implementation of the design. Based on nearly 10 years of highway construction projects in Fujian province,the ones which have a great impact on the cost of the project are extracted from each project,including pricing earthwork,engineering denominated stonework,protecting works,drainage works,bridge construction,tunnel construction and the corresponding terrain index parameters. SPSS is used to do the correlation analysis and analyzes the key indicators terrain which controls the five quantities. And the example shows that the model can predict effectively 5 quantities in different terrain conditions and reasonable value of the total cost,with high precision,easy to operate.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

As in the case of known corridor belt,the highway construction cost is predicted,which helps to limit the implementation of the design. Based on nearly 10 years of highway construction projects in Fujian province,the ones which have a great impact on the cost of the project are extracted from each project,including pricing earthwork,engineering denominated stonework,protecting works,drainage works,bridge construction,tunnel construction and the corresponding terrain index parameters. SPSS is used to do the correlation analysis and analyzes the key indicators terrain which controls the five quantities. And the example shows that the model can predict effectively 5 quantities in different terrain conditions and reasonable value of the total cost,with high precision,easy to operate.

Key concepts: Terrain, Earthworks, Bridge (graph theory), Civil engineering, Cost estimate, Transport engineering, Drainage, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Highway cost estimation system based on terrain — Research Paper | ScholarLens