2012Caikuang yu anquan gongcheng xuebaoRequires access

Stress distribution of coal pillar with gob-side entry driving in the process of excavation & mining

Xigui Zheng, Yao Zhi-gang, Nong Zhang

Open publisher page 33 citations

Abstract

The stress distribution of coal pillar with different width in the stage of excavation and min-ing was studied based on the theory analysis,numerical simulation,engineering practice,the similarities and differences of stress evolution of coal pillar and entity sidewall caused by different width of coal pillar was analyzed.The opinion was put forward that the infection of roadway driving and coal mining need considered simultaneously when determination the reasonable width for coal pillar.The results show that the proper width of coal pillar should large than six meters for the deformation is attenuation with the increased with of coal pillar.However,the increased width coal pillar such as eight meters not only have reduced contribution ratio to control the sidewall deformation in the stage of coal mining,but also caused top and floor deformation increased.Therefore,the reasonable width of coal pillar is eight meters.

About this research paper

What this paper is about

The stress distribution of coal pillar with different width in the stage of excavation and min-ing was studied based on the theory analysis,numerical simulation,engineering practice,the similarities and differences of stress evolution of coal pillar and entity sidewall caused by different width of coal pillar was analyzed.The opinion was put forward that the infection of roadway driving and coal mining need considered simultaneously when determination the reasonable width for coal pillar.The results show that the proper width of coal pillar should large than six meters for the deformation is attenuation with the increased with of coal pillar.However,the increased width coal pillar such as eight meters not only have reduced contribution ratio to control the sidewall deformation in the stage of coal mining,but also caused top and floor deformation increased.Therefore,the reasonable width of coal pillar is eight meters.

Why it matters

OpenAlex reports 33 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The stress distribution of coal pillar with different width in the stage of excavation and min-ing was studied based on the theory analysis,numerical simulation,engineering practice,the similarities and differences of stress evolution of coal pillar and entity sidewall caused by different width of coal pillar was analyzed.The opinion was put forward that the infection of roadway driving and coal mining need considered simultaneously when determination the reasonable width for coal pillar.The results show that the proper width of coal pillar should large than six meters for the deformation is attenuation with the increased with of coal pillar.However,the increased width coal pillar such as eight meters not only have reduced contribution ratio to control the sidewall deformation in the stage of coal mining,but also caused top and floor deformation increased.Therefore,the reasonable width of coal pillar is eight meters.

Key concepts: Coal, Mining engineering, Excavation, Coal mining, Deformation (meteorology), Pillar, Geotechnical engineering, Geology