2005Journal of Highway and Transportation Research and DevelopmentRequires access

Static Load Test of Concrete-filled Steel Tubular Arch Bridge

Hongnan Wang

Open publisher page 0 citations

Abstract

A concrete-filled steel tubular arch bridge has a span of 52m.To evaluate its working state and load carrying capacity,the bridge was tested under static loads after the bridge was constructed because of its poor appearance.Three container lorries with same carrying capacity were used.The test includes transverse load distributing coefficient of mid and quartile span of the main bridge,strain influence line of the main measuring point on critical section,strain and deflection of the main measuring point on critical section under basic load.The whole procedure of the bridge test was introduced briefly.The test data was sorted out and analyzed.

About this research paper

What this paper is about

A concrete-filled steel tubular arch bridge has a span of 52m.To evaluate its working state and load carrying capacity,the bridge was tested under static loads after the bridge was constructed because of its poor appearance.Three container lorries with same carrying capacity were used.The test includes transverse load distributing coefficient of mid and quartile span of the main bridge,strain influence line of the main measuring point on critical section,strain and deflection of the main measuring point on critical section under basic load.The whole procedure of the bridge test was introduced briefly.The test data was sorted out and analyzed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A concrete-filled steel tubular arch bridge has a span of 52m.To evaluate its working state and load carrying capacity,the bridge was tested under static loads after the bridge was constructed because of its poor appearance.Three container lorries with same carrying capacity were used.The test includes transverse load distributing coefficient of mid and quartile span of the main bridge,strain influence line of the main measuring point on critical section,strain and deflection of the main measuring point on critical section under basic load.The whole procedure of the bridge test was introduced briefly.The test data was sorted out and analyzed.

Key concepts: Structural engineering, Deflection (physics), Load testing, Influence line, Arch bridge, Truck, Arch, Bridge (graph theory)

Related papers

Back to paper searchBrowse research topicsOriginal source
Static Load Test of Concrete-filled Steel Tubular Arch Bridge — Research Paper | ScholarLens